CC 1777         
Once the train is clear of East Cabin, the engineer peels back the throttle to run 8 for the fast trip to Portage. The CC&P was responsible for the maintenance and dipatching of the double track between East Cabin and Portage and the BN had trackage rights. The BN experienced frequent delays by the CC&P and purchased the westbound track in 1992 and took over dispatching duties.
Date: 9/20/1989 Location: East Dubuque, IL   Map Show East Dubuque on a rail map Views: 332 Collection Of:   Richard Kundert
Locomotives: CC 1777(GP10)    Author:  Richard Kundert
CC 1777
Picture Categories: Action This picture is part of album:  Chicago Central & Pacific
Share
User Comments
Name Type Comments Date
Mike Maskel General NICE SHOT 5/26/2016 12:18:24 PM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4463866